Setting procedure
1. Only with analog adjustment of heating curve: Adjust the bar in agreement with the planning
documentation or according to local practice.
2. Make settings on operating lines 1...41 ("Enduser").
3. Select plant type on operating line 51.
en
4. Make the required settings according to the following parameter list. All functions and oper-
ating lines required for the selected plant type will be activated and can be set. All operating
lines that are not required are locked.
5. Enter the values set in the table!
6. Select the service functions, if required (independent of type of plant).
7. Carry out the final work.
Notes on commissioning and functional check
•
Specific operating lines for the functional check:
– 161 = simulation of outside temperature
– 162 = relay test
– 163 = sensor test
– 164 = test of contacts "H"
•
If the display shows
Building Technologies
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk -
[email protected] 0844 556 1818
: Query operating line 50 to pinpoint error
74 319 0619 0 a
17.04.2008
38/288