melitta CAFFEO SOLO&perfect milk Manual De Instrucciones página 81

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 177
Phase 2
During Phase 2, two bean symbols
→ The integrated descaling programme is started. Water flows inside
the appliance into the drip tray in multiple intervals. This process lasts
approximately 15 minutes. Then the valve symbol
8 Ensure that the coffee grounds container is placed under the
Cappuccinatore.
9 Turn the valve switch (Fig. A, No. 11) clockwise to the stop to open the
valve.
→ Water will flow intermittently out of the Cappuccinatore into the coffee
grounds container. The symbol for the valve
This process lasts approximately 10 minutes. Subsequently, the symbol for
the drip tray
10 Leave the valve open.
11 Empty the coffee grounds container and the drip tray and then reinsert
the drip tray. Place the coffee grounds container back under the
Cappuccinatore.
→ The symbol for the water tank
12 Thoroughly rinse the water tank, fill it to the max. mark with fresh tap
water and reinsert it.
13 Press the button for steam dispensing
integrated descaling programme.
→ Phase 2 is completed.
are shown on the display.
illuminates.
illuminates.
illuminates.
flashes during this process.
to continue with the
79

Hide quick links:

Tabla de contenido
loading

Tabla de contenido