Daily Preventive Maintenance Checklist - Alliance Laundry Systems SF135PV Operación Y Mantenimiento

Ocultar thumbs Ver también para SF135PV:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Daily Preventive Maintenance
Checklist
____________________________
Machine
___________________________
Operator
Disconnect power to the machine before performing the daily maintenance procedures.
1. Inspect water inlet valve hose connections on the back of the
machine for leaks.
2. Inspect steam hose connections for leaks, where applicable.
3. Verify that insulation is intact on all external wires and that all
connections are secure.
4. Inspect door lock and interlock before starting operation:
a. Attempt to start the washer with door open.
b. Close the door without locking it and attempt to start the washer.
c. Close and lock the door, start a cycle, and attempt to open the
door while the cycle is in progress.
5.
1. Clean the AC drive box filter(s).
2. Clean motor cooling fan filter.
3. Clean the door gasket of all foreign matter.
4. Clean automatic supply dispenser and lid.
5. Clean the washer's top, front, and side panels.
6. Leave loading door open at the end of each day to allow moisture to
evaporate.
7.
NOTE: Unload the machine promptly after each completed cycle to prevent moisture buildup.
NOTE: Leave loading door open after each completed cycle to allow moisture to evaporate.
NOTE: Improper replacement of the AC drive box filter will result in clogging of the pump.
F232102
Checks
Observe All Safety Warnings!
Beginning of Day
End of Day
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Maintenance
Week of: ________________
Days
1
2
3
4
5
6
7
43

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Sf250pvSf250pv tiltUf135pvUf250pvUf250pv tilt

Tabla de contenido