Kohler STERLING 5300EZ Serie Guia De Instalacion página 5

Ocultar thumbs Ver también para STERLING 5300EZ Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Top Track
Rollers away from
inside of shower
3. Install the Door Panels
NOTE: There is a label on the door panel identifying the "Non-coated side" of the panel. When installing
glass panels with a coating, the "Non-coated side" should face the outside of the bath/shower.
Inside Panel Installation
Position the inside glass panel with the rollers facing the inside (shower side) of the bath/shower.
Carefully lift the top of the inside panel up into the top track and hang the rollers on the inside
track rail.
Outside Panel Installation
Position the outside glass panel with the rollers facing away from the bath/shower.
Carefully lift the top of the outside panel up into the top track and hang the rollers on the outside
track rail.
Panel Adjustment
Roll the panels back and forth to make sure they operate smoothly and do not interfere with the
frame.
NOTE: The upper hole lowers the panel and the lower hole raises the panel. Panels can be adjusted for
out-of-plumb walls using these holes.
If adjustment is needed, move the roller(s) to a different hole in the hanger bracket.
Use a flat-blade screwdriver to loosen or tighten the mounting screw.
Remove the protective vinyl strips from the bottom of the glass panels.
Sterling
Top Track
Rollers toward inside
of shower.
Inside
Panel
Outside
Panel
Lower Hole
Raises Panel
Factory
Position
5
Upper Hole
Lowers Panel
Note:
Shown for adjustment
purposes only. Rollers are
pre-installed at the factory.
1011075-2-F
Tabla de contenido
loading

Tabla de contenido