Chap. 5. Maintenance, Damages Research And Cleaning - HURAKAN TMC Manual De Instruccion

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
CHAP. 5.
MAINTENANCE, DAMAGES RESEARCH AND CLEANING
MAINTENANCE MAN REQUIREMENTS
With the word "maintenance" it must not be intended only the periodic check of the machine normal functioning but also the
analysis and the consequent remedy of all those causes that for any reason put it out of service. It is absolutely necessary that
for the activities of maintenance, cleaning, parts change and damages research performed from the user, this task is
entrusted to skilled people, competent and authorized from the employer.
All operations of maintenance, cleaning and parts change, none excluded, must be peremptorily performed with the machine
completely stopped and insulated from the external feeling sources.
MAINTENANCE PRESCRIPTIONS
SHELTERS REMOVAL AND/OR PROTECTION DEVICES
For some intervention of the present charter, it is necessary to remove from their position some fixed shelters.
The removal can happen only from the maintenance man.
At the end of the interventions, these shelters must be replaced and blocked in their original position, with the fastening
systems that were foreseen before the intervention.
The maintenance responsible must deactivate completely the machine, as here follow showed, before to proceed to the
fixed shelter removal and/or to the element change.
INSULATION FROM THE EXTERNAL FEEDING SOURCES
Before to perform any operation of maintenance, cleaning and parts change, the external feeling sources must be dissected
and insulated.
Position to "zero" the protection
device placed to the bottom of the
electric equipment feeding line.
DAMAGES RESEARCH OR FAILURES AND MOBILE ELEMENTS UNBLOCK
Here follow are indicated he interventions for the damages research or failures and mobile elements unblock that can be
performed from maintenance men.
TYPE
POTENZIAL/S CAUSE/S
General black out
Net voltage
Fuses or magneto thermals intervention
lacking
placed to the bottom of the machine
feeding line
Protection device intervention inside
the machine
Functioning
intervention
Moving shelter opening
Cause/s not identifiable
Feeding voltage lacking.
Sectioning devices on "O".
The machine
doesn't
Fuses intervened or not functioning
function: the
magneto thermals.
tool doesn't
rotate or
Lacked functioning of the run button
doesn't
perform the
cutting
Thermal intervention due to the over
correctly,
heating
creating great
lumps
Micro switch damaged
Cutting tool worn or ruined
Disconnect the general sectioning
device and provide to protect the
plug with appropriate systems
MODALITY AND COMPARISONS
Contact the electric energy distributor.
After having eliminated the causes that have determined the protection device
intervention, restore it. In case of problem persistency contact an electrician
technician.
Contact an electrician technician: after to have eliminated the causes that have
determined the protection device interventions, restore it.
In case of fuses interventions, change it with types of the same model, calibration
and intervention curve.
Slacken the knob and opening the moving shelter, the machine stops immediately
for the safety micro switch functioning.
Close the moving shelter and tighten the block knob and start the machine.
Contact directly the Authorized Assistance Centre
Check and restore the electric energy.
Turn the sectioning devices in the position "ON"
Make change the intervened fuses, check the magneto thermal switches condition.
Check the efficiency of the button of "I" and eventually contact directly the
Authorized Assistance Centre.
Wait the complete cooling before the machine restarting
Contact directly the Authorized Assistance Centre
Contact directly the Authorized Assistance Centre
ORIGINAL INSTRUCTIONS TRANSLATION
Pag
di
11
13
Tabla de contenido
loading

Tabla de contenido