Preparation; Initial Start-Up And Longer Breaks In Use; Prior To Starting The Work Day - B.A. International BA ULTIMATE Instrucciones De Uso

Ocultar thumbs Ver también para BA ULTIMATE:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 143
6556067_EN.book Seite 20 Montag, 18. April 2016 2:41 14
4 Preparation
20
4

Preparation

4.1

Initial start-up and longer breaks in use

✔ The turbine is only able to reach full power if indicated operating
Turbine
pressures are set [ → 15]. If necessary have the pressures checked
by a service engineer with a star tester that is placed between the
supply hose and the quick coupling.
➢ Sterilize the turbine and accessory parts prior to startup.
➢ Clean and maintain the turbine after longer breaks in use.
4.2

Prior to starting the work day

➢ Purge the water and air channels for 30 seconds.
Operating Instructions BA ULTIMATE
65 56 067 D3560.201.09.02.02
Tabla de contenido
loading

Este manual también es adecuado para:

Ba 695Ba 688Ba695lw

Tabla de contenido