Delta 17T Serie Manual Para Los Propietarios página 7

Ocultar thumbs Ver también para 17T Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

B-4
4
1
Temperature handle Installation
Turn on water supplies; LET THE WATER RUN AT BOTH FULL HOT AND FULL COLD TO ENSURE THE WATER IS
RUNNING AS HOT/COLD AS POSSIBLE.Place the temperature handle (1) onto the spline, then rotate the temperature
handle until you achieve your maximum desired temperature from the outlet (not more than 120° or the lower temperature
mandated by your local plumbing code). Then take off the temperature handle and assemble it onto the spline again to make
sure the temperature handle limit stop (2) hits against the volume handle limit stop (3) as shown. Install temperature handle
with set screw (4), cover set screw with handle button (5).
5
Potential scald or thermal shock injury could result due to cross flow if outlet at the shower is blocked or
restricted (e.g., pause control on showerhead). Be sure to point showerhead away from you when re-
starting flow or install inlet check valves on both supply lines to prevent possible injury.
5
7
3
2
107530 Rev. C
Tabla de contenido
loading

Tabla de contenido