1
Cartridge Installation
A.
1
Turn off water supplies. Remove bonnet nut
(1) and test cap (2) from the body. Place a
bucket or small container over the front of the
valve body and slowly open the water supplies
to flush any debris from the supply lines before
installing the cartridge. Turn the water suplies
back off. If this is not a thin wall mounting, the
entire plasterguard (3) may be removed. If
screen (4) is in place, remove before installing
cartridge.
C.
Slide bonnet nut (1) over the cartridge and
thread onto the body. Hand tighten securely.
3
4
2
1
B.
4
1
Rotate the cartridge (1) so the word "UP" (2)
appears on the top. The "H" must be on the
hot side and the "C" must be on the cold side.
Add silicone lube to the three o-rings (3) shown
above to make the cartridge easier to install and
remove from the valve body. Insert cartridge
into valve body as shown. Ensure the keys on
the body are fully engaged with the slots in the
body (4).
Back to back Installation
Normal Installation
(changes not required)
Reverse
Installation
3
For the exceptions of back to back or reverse
installations (hot on right and cold on left) only:
Rotate cartridge (1) so "H" is on the hot side
and "C" is on the cold side and the word "UP"
(2) appears on the bottom. Add silicone lube
to the three o-rings shown above to make the
cartridge easier to install and remove from the
valve body. Install the cartridge making sure
that the keys are fully engaged with the slot in
the brass body (see step B). Slide bonnet nut
(3) over the cartridge and thread onto the body.
Hand tighten securely.
3
2
3
2
Clod
1
Hot
107530 Rev. C
4