Electrical Wiring; Control Box - Riello RG5DF Instrucciones De Instalación, Montaje Y Funcionamiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3.5 ELECTRICAL WIRING

WARNING
DO NOT EXCHANGE
NEUTRAL WITH PHASE
~
50/60Hz 220/230V
N
L
T
Safety
thermostat
7 pin plug
L1
N
7 pole socket
Ignition

CONTROL BOX

electrodes
552SE
D4958
A
S7120
2902
NOTES:
– Wires of min. 1 mm
– The electrical wiring carried out by the installer must be in
Main switch
T6A
Limit thermostat
T
T1
T2
S3
B4
Brown
Blue
Brown
Blue
Black
White
Blue
nd
2
stage oil valve
Burner-earth
Fig. 11
CONTROL BOX
To remove the control-box from the burner, loosen screw (A, fig. 11) and pull
to the arrow direction, after removing all components, the 7 pin plug and
earth wire.
In case of disassembly of the control box, retighten the screw (A) with a
torque wrench setting of 1 – 1.2 Nm.
2
section. (Unless requested otherwise
by local standards and legislation).
compliance with the rules in force in the Country.
Connect 2nd stage thermostat between clamps T6 - T8
by removing the bridge.
TESTING: Check the shut-down of the burner by opening
the thermostats and the lock-out by darkening
the photoresistance.
st
1
stage
h
hour counter
(230V - 0.1A max.)
Remote lock-out signal
(230V - 0.5A max.)
Photoresistance
2 1
7
GB
nd
2
stage hour counter
h
(230V - 0.1A max.)
nd
2
stage
T
thermostat
4 pin plug
B5
T6
T7
T8
4 pole socket
st
1
stage oil valve
M
~
3 2 1
M
ELECTRONIC
DELAYING DEVICE

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

398t13739870

Tabla de contenido