Electrical Wiring; Standard Electrical Wiring; Air Pressure Switch; Pin Plug - Riello 40 FS8C Instrucciones De Instalación, Uso Y Mantenimiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

3.4

ELECTRICAL WIRING

3.4.1 STANDARD ELECTRICAL WIRING

Ionization probe
Electrode
Ignition transformer

Air pressure switch

Motor
Blue
White
Black
ATTENTION:
Do not swap neutral and phase over, follow the diagram shown carefully and carry out a good earth connection.

The section of the conductors must be at least 1mm². (Unless requested otherwise by local standards and legislation).

The electrical wiring carried out by the installer must be in compliance with the rules in force in the country.

Verify that the burner stops by operating the boiler control thermostats and that the burner locks out by separating

the red ionisation probe lead connector.
NOTES
The burners have been type-approved for intermittent operation. This means they must stop at least once every 24 hours in
order to allow the electrical control box to check its efficiency on start-up. The boiler limit thermostat (TL) normally ensures
the burner halts. If this does not happen a time switch halting the burner at least once every 24 hours must be applied in se-
ries to limit thermostat (TL).
2741
Connector
Control box
RMG 88.620A2
D4275
Burner earth
~
230V
50Hz
5
GB
KEY TO LAY-OUT
XP6 – 6 pole socket
XP7 – 7 pole socket
X6 – 6 pin plug
X7 – 7 pin plug
B4 – Working signal
h1 – Hour counter
PG – Minimum gas pressure
switch
S3 – Remote lock-out signal
(230V - 0.5 A max.)
T6A – Fuse
TL – Limit thermostat
TS – Safety thermostat
V10 – Safety valve
V11 – Adjustment valve
Suppressor
CARRIED-OUT
IN THE FACTORY
TO BE DONE BY
THE INSTALLER
ATTENTION
In the case of phase-phase
feed, a bridge must be fit-
ted on the control box ter-
minal
board
between
terminal 6 and the earth
terminal.
Tabla de contenido
loading

Este manual también es adecuado para:

593 m3759303

Tabla de contenido