Maintenance Report - Incold ROLL UP-ZIP Manual De Uso Y Mantenimiento

Puerta con teclado de membrana
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

7. MAINTENANCE REPORT

Installation
Start of maintenance
Date
Stamp/Signature
Date
Stamp/Signature
Door model and installation site
Model
Location
Door n
VERIFICATION OF THE UNLOCKING CAPACITY AFTER FIRST INSTALLATION
After installation, it is necessary to perform a door ability to move and return to initial position. The
outcome of this check, performed on the date shown above, is: [ ] POSITIVE
[ ] NEGATIVE
If the test fails, report it in the NOTES field the countermeasures adopted, indicating the resolution
timing of the failure and record the result of the following check.
46
Tabla de contenido
loading

Este manual también es adecuado para:

Roll up-glide

Tabla de contenido