EN
2 / INSTALLING YOUR APPLIANCE
• ASSEMBLING THE VENTILATION
SHAFT
• Outdoor evacuation
— Calculate the fi nal height for fi xing the
duct support U-bracket (Pic. 3)
— Mark the two holes accordingly
— Drill 8 mm diameter holes and secure
the duct support bracket, ensuring that it is
fi xed on the same axis as the hood ( Pic. 3)
— Fix the fl at bracket behind the lower
duct. ( Pic. 8)
— Fix the two ducts to the hood.(Pic. 7)
— Connect the sleeve to the air outlet to the
outside. ( Pic. 5)
— Make the electrical connection to the
hood using the mains supply cable.
— Lift the upper duct up to the ceiling and
fi x it to the bracket using the screws. ( Pic. 6)
Pict 3
Pict 4
35
pict. 6
Pict 6
pict. 7
Pict 5
pict. 8