Operation Instructions; Connecting The Lp Tank - Master Forge DGY784CP Manual Del Usuario

Tabla de contenido
ASSEMBLY INSTRUCTIONS
10. Mount the temperature gauge assembly.
Insert the probe of the temperature
gauge (L) through the temperature gauge
bezel (K) and middle hole of the smoker
door from the outside. Secure using 2
nuts (BB) from inside panel by using
1/2 in. wrench.
Hardware Used
1/4-20 Flanged
BB
Washer Nut

OPERATION INSTRUCTIONS

CONNECTING THE LP TANK

WARNING
ALL INSTRUCTIONS AND SAFEGUARDS ON THIS PAGE MUST BE FOLLOWED TO PREVENT
FIRE, DAMAGE AND/OR INJURY.
1. The knob on the LP tank must be closed. Make sure that the knob is turned clockwise
to a full stop. The cylinder supply system must be arranged for vapor withdrawal.
2. Check that the control knob on the control unit is turned off.
3. Remove the protective cap from the LP tank valve and coupling nut.
4. Hold the regulator in one hand and insert the nipple into the valve outlet. Be sure the nipple
is centered in the valve outlet. The coupling connects to the large outside threads on the
valve outlet. Use care – do not cross thread the connection.
5. Hand tighten the coupling clockwise until it comes to a full stop. Firmly tighten by hand only.
Do not use tools.
CAUTION: In the connection
process, make sure the regulator
inlet connector mates with the
cylinder valve outlet properly,
safely and firmly.
10
x2
11
K
L
Straight
BB
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

0190449

Tabla de contenido