Kohler K-11748-K Guía De Instalación Y Cuidado página 8

Ocultar thumbs Ver también para K-11748-K:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

2x4 Bracing
Hot Supply
3. Roughing-In
Showerhead/Handshower Installations
For Back-to-Back Installations: Proceed to the "Install the Supply
Piping and Valve, Back-to-Back" section.
Route the supplies and install the valve. Refer to the roughing-in
illustration for your installation.
NOTE: The position of the 2x4 bracing is dependent on the
thickness of your finished wall.
Install 2x4 bracing behind the plate as shown.
NOTE: The outlet positions are dependant on your particular
installation and may differ from the illustration shown.
Install bracing at the showerhead and handshower outlet
installation locations.
Connect the water supplies using 1/2" copper, CPVC, or PEX
components. Use thread sealant on all threaded connections.
1128093-2-E
2-1/16" (52 mm)
72" (1829 mm) –
78" (1981 mm)
To Floor (Typical)
2-3/4" (70 mm)
48" (1220 mm)
To Floor
2-1/16" (52 mm)
Cold Supply
2-3/4" (70 mm) –
3-1/2" (89 mm)
8
Finished Wall
Thin Wall
Finished
Wall
Thick Wall
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-11748-ks

Tabla de contenido