Tabla De Contenido - LG 18K BTU Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

OUT-LINE OF INSTALLATION
Installation works
location............................4
1) Preparation of Piping...12
the Outdoor Unit ..........14
5. Checking the Drainage ..............................................................................14
Indoor Unit ...................15
2) Connecting cables to the
Outdoor Unit ................16
3) Form the pipings ..........17
Installation Parts
Four Type "A" screws
Connecting cable
1
/
",
2
1
/
",
Liquid side .............
4
Insulated drain hose
Insulation materials
Additional Drain hose
(Inner Dia...............25mm)
2
Required tools
Level
Screw driver
Electric drill
Hole core drill (ø70mm)
5
/
",
3
/
"
Flaring Tools set
8
4
3
/
",
1
/
"
8
2
Screw driver
Hexagonal Wrench (4mm/5mm)
Gas-leak Detector
Tabla de contenido
loading

Este manual también es adecuado para:

24k btu36k btu60k btu

Tabla de contenido