Before Starting Break-In Procedure - Husky Y6020 Manual Del Operador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Drain Valve: The drain valve is located at the
base of the air tank and is used to drain
condensation at the end of each use.
Cooling System (not shown): This compressor
contains an advanced design cooling system. At
the heart of this cooling system is an engineered
fan. It is perfectly normal for this fan to blow air
through the vent holes in large amounts. You know that the cooling system is
working when air is being expelled.
Air Compressor Pump (not shown): Compresses air into the air tank.
Working air is not available until the compressor has raised the air tank
pressure above that required at the air outlet.
Check Valve (not shown): When the air compressor is operating, the check
valve is "open", allowing compressed air to enter the air tank. When the air
compressor reaches "cut-out" pressure, the check valve "closes", allowing air
pressure to remain inside the air tank.
Tool Storage: Grips and holds quick connect plug
on tools and accessories in place for storage.
Accessory Storage: Stores and protects
accessories when not in use.
How to Use Your Unit
How to Stop:
1.
Set the On/Auto/Off switch to "OFF".
Before Starting
Break-in Procedure
Serious damage may result if the following break-in
instructions are not closely followed.
This procedure is required before the air compressor is put into service and
when the check valve or a complete compressor pump has been replaced.
1.
Make sure the On/Auto/Off switch is in the "OFF" position.
NOTE: Pull coupler back until it clicks to prevent air from escaping through the
quick connect.
D29616
12- ENG
Tool Storage
Accessory
Storage
Drain
Valve
Tabla de contenido
loading

Tabla de contenido