Breaking In The Pump - Husky H15123TK Manual Del Operador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

BREAKING IN THE PUMP

See Figure 4 - 5.
Check and tighten all bolts, fittings, etc.
Turn the pressure regulator knob fully clockwise to
open the air flow.
Place the switch in the OFF position and plug in the
power cord.
Open the drain valve completely.
Turn the air compress ON ( l ) and run the air
compressor for 10 minutes to break in pump parts.
Place the switch in the OFF position.
Close the drain valve.
ATTACHING HOSE
See Figure 6.
Make sure the air compressor is off and unplugged.
Rotate pressure regulator knob fully counterclockwise.
Insert the hose into the quick coupler already installed
on the compressor (Fig. 6).
WARNING:
Do not attach any tools to the open end of the hose until
start-up has been completed.
Firmly grasp the open end of the hose; hold facing
away from yourself and others.
ASSEMBLY
ASSEMBLY
REGULATOR
PRESSURE
GAUGE
PRESSURE
REGULATOR
KNOB
QUICK
COUPLER
DRAIN VALVE
QUICK
COUPLER
13
TANK
PRESSURE
GAUGE
ON/OFF
SWITCH
SAFETY
VALVE
Fig. 4
Fig. 5
HOSE
Fig. 6

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido