Breaking In The Pump - Husky Trim-Plus H1503TP-R Manual Del Propietário

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ATTACHING HOSE
Attach the supplied quick-connect fitting to hose (note:
wrap threaded ends with supplied thread sealing tape
before securing fittings to hose).
Push male end of hose into quick coupler already
installed on the compressor.
WARNING:
Do not attach any tools to the open end of the hose until
start-up has been completed.

BREAKING IN THE PUMP

See figure 3 - 5
Check and tighten all bolts, fittings, etc.
Turn the pressure regulator knob fully clockwise to
open the air flow.
Place the switch in the OFF (0) position and plug in the
power cord.
Open the drain valve completely.
Place the switch in the ON ( l ) and run the air
compressor for 10 minutes to break in pump parts.
Place the switch in the OFF (0) position.
Close the drain valve.
ASSEMBLY
PRESSURE REGULATOR KNOB
12
QUICK COUPLER
SWITCH
DRAIN VALVE
Fig. 3
Fig. 4
Fig. 5
Tabla de contenido
loading

Tabla de contenido