GAS FEED SYSTEM AT LOW PRESSURE (max.
400 mm.W.C.)
When the burner has been correctly fastened to the
boiler, proceed with connecting it to the gas pipeline
(see BT 8780).
The dimension of the gas adduction pipeline should be in
proportion to its length and to gas delivery and the load loss
should not exceed 5 mm.W.C. (see diagram).
It must also be perfectly hermetic and adequately tested
before the burner's general inspection. It is indispensable
to install a proper fitting on the pipeline, in proximity to the
burner, to allow for easy disassembling of the burner and/or
opening of the boiler door.
In addition, the following should be installed: a cut-off cock,
a gas filter, a stabilizer or a pressure regulator (when the
feed pressure is superior to 400 mm.W.C. = 0,04 bar), and
an antivibration joint. These parts should be installed as
described in our drawing (see BT 8780).
We consider it useful to give the following practical tips for
installing the essential accessories on the gas pipeline near
to the burner:
1) To avoid big drops in pressure on ignition, the length of
the pipeline between the point where the stabilizer or
reducer is fitted and the burner should be from 1,5 to 2
m. This pipe must have a diameter equal or superior
to that of the burner attachment fitting.
2) The gas fitting must be applied on horizontal pipes.
This is to avoid any impurities falling into the pipes or
entering the stabilizer during cleaning.
3) To get the best performance out of the pressure
stabilizer, it is advisable to fit it into horizontal pipes,
after the filter. In this way, the vertical movement of the
entire mobile part (shutter) of the stabilizer is rapid.
(If the movement of the mobile part were horizontal
- with the stabilizer fitted onto vertical pipes - friction to
the guide bush/es of the pin to which the entire mobile
part is fitted would delay movement).
4) We advise installing a bend directly onto the burner
gas ramp before applying the removable fitting.
This layout makes it possible to open the boiler door,
if there is one, after the pipe fitting itself has been
opened.
The above information is clearly illustrated in drawing
BT 8780.
GENERAL DIAGRAM FOR INSTALLATION OF GATE-FIL-
TER-STABILIZER-ANTI-VIBRATION JOINT-OPENABLE
42 / 132
0006080093 ed2006/07
ENGLISH
PITTING
Tabla de contenido
loading

Este manual también es adecuado para:

Comist 72Comist 122

Tabla de contenido