PREPARE THE OPENING
Installation over a Wall Oven:
30"
17-1/2"
45-1/4"
Min.
• If you are replacing an electric double oven with the
combined installation of an Advantium Built-In Oven
and a single oven, use the dimensions shown. The
middle rail separating the two openings may need to
be larger than the 2" minimum shown.
6
Standard Installation Preparation
(CONT.)
Construct
23-1/2"
solid bottom
- Min. 3/8"
plywood
supported
on all four sides.
Must be able to
support weight
25-1/4"
of oven and
contents.
2" Min.
(3" Recommended)
Per Oven
Requirement
PREPARE THE OPENING
Installation over a Wall Oven and Warming

Drawer:

30"
25-1/4"
17-1/2"
45-1/4"
Min.
Per warming drawer requirement
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location does not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting the
cabinet load, in addition to the added weight of the
oven and drawer, plus additional oven loads.
(CONT.)
Construct
Solid Bottom
23-1/2"
Min. 3/8"
Plywood
Supported
by
2x4 or 2x2
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
2" Min.
31-2000354 Rev. 0