GE CSB913 Instrucciones De Instalación página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Flush Mount Installation Preparation
PREPARE THE INTERIOR
Cut and install side cleats:
• Cut side wood cleats to height of cabinet opening
and approx. 2-1/2" in depth. Install, on each side,
1-3/8" from the front face of the cabinet.
Cut and install bottom cleat:
• Cut bottom wood cleat to a height of 1-1/8", a depth
of the cabinet minus 1-3/8" and a width of 25-1/4"
to fit between side cleats. Install onto the cabinet
floor between the side cleats, push it all the way
back against cabinet wall and make sure its front face
aligns with the front faces of the side cleats (1-3/8"
gap from the front cabinet face).
A
B
A
Side cleats depth
B
Bottom cleat height
C
Bottom cleat depth
D
Bottom cleat width
E
All three cleats
C
A
Front Face of Cabinet
E
31-2000354 Rev.0
A
C
D
E
2-1/2" min.
1-1/8"
Cabinet depth minus 1-3/8"
25-1/4"
1 1/4"
D
TOP
VIEW
E
PREPARE THE OPENING
The Advantium Built-In Oven can be installed
in combination with other Advantium Built-In
ovens. Always follow each product's Installation
Instructions to complete the installation.
Single Advantium Built-In Oven
Installation:
Cut the opening in a cabinet to the dimensions
shown.
**20 5/8"
36-3/4"
Min.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
Approved Flush Installation
Single Advantium
Over Warming Drawer
Over Oven
Over Oven and Warming Drawer
A
Over Advantium Built-In Oven
Double Advantium (side by side)
Under Cooktop or Countertop
** Top and bottom reveals are set to
Construct
.
23-1/2" min
solid bottom
- Min. 3/8"
plywood
supported on
all four sides.
Must be able to
F *
support weight
of oven and
contents.
Dimension F
1/8" Reveal 1/4" Reveal
30"
30-
/
"
1
4
30"
30-
/
"
1
4
30"
30-
/
"
1
4
30"
30-
/
"
1
4
30"
30-
/
"
1
4
See page 10
See page 10
/
".
1
8
9

Capítulos

Tabla de contenido
loading

Tabla de contenido