Calibration Check - MSA ALTAIR 5 Manual De Instrucciones

Ocultar thumbs Ver también para ALTAIR 5:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

OPERATION
3.8.

Calibration Check

The calibration check is simple and should only take about one minute.
Perform this calibration check before each day's use for each installed
sensor.
(1) Turn ON the ALTAIR 5 or ALTAIR 5 IR Multigas Detector in clean,
fresh air.
(2) Verify that readings indicate no gas is present.
(3) Attach regulator (supplied with calibration kit) to the cylinder.
(4) Connect tubing (supplied with calibration kit) to the regulator.
(5) Attach other end of tubing to the instrument.
(6) Open the valve on the regulator, if so supplied.
The reading of the ALTAIR 5 or ALTAIR 5 IR Multigas Detector
display should be within the limits stated on the calibration cylinder
or limits determined by your company.
If necessary, change cylinder to introduce other calibration.
If readings are not within these limits, the ALTAIR 5 Multigas
Detector requires recalibration (see Section 3.9).
38
ALTAIR 5 - Operating Manual
MSA
US
Tabla de contenido
loading

Este manual también es adecuado para:

Altair 5ir

Tabla de contenido