Spanset DSL2 Manual Del Usuario página 11

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
2
1.75
1.5
1.25
1
0.75
0.5
0.25
0
1
-0.25
-0.5
-0.75
-1
-1.25
-1.5
-1.75
-2
Clearance Height Table
The precise clearance values can be read from the graph above to show the required free space below the workers feet during
work at height activities. The y-axis shows the relative position of the anchorage which the User connects to in respect to their
harness D-ring. The x-axis then shows values, based on User body mass, of required clearance.
Example 1
A 100kg User connects to an anchor at 0m, or equal to the D-ring. The clearance required would be 2.4m.
Example 2
A 100kg User connects to an anchor 1m above the D-ring. The clearance required would
be 1.45m
NOTE: CLEARANCE VALUES SHOWN ARE INCLUSIVE A 1M CLEARANCE MARGIN.
DSL2 0216-1.0
1.5
2
2.5
80kg User
100KG User
120kg User
140kg User
DSL2
Annex A
Clearance Heights
3
3.5
4
4.5
5
5.5
11
Tabla de contenido
loading

Tabla de contenido