Pump Installation; Cable Installation - Pentair P42B0005A1 Instrucciones De Instalación Y Funcionamiento

Tabla de contenido
Installation
Butt Connectors with plastic insulators - For wire
longer than second.
2. Cut off cable ends. Be sure to match colors
and lengths of wires in drop cable to colors
and lengths of motor leads.
ends and motor lead ends.
cap and a neoprene gasket sleeve on each wire
5. Slide insulator body onto one wire end
motor wire colors.
7. Center insulator body over splice and slide
neoprene sleeves into body as far as they
will go. Screw caps onto insulator body
waterproof splice.

Cable Installation

connect it to proper power supply. Power
Rotation for three
phase pumps.
2. Fasten cable leads securely to pump discharge
leads at this point. Securely fasten leads to
twisting damage as pump starts and stops.
3. Connect copper ground wire to motor bracket.
supplying current to motor. Consult current
Code and local codes (as applicable) for
grounding information.
manufacturer. When lowering pump into well,
intervals with electrical tape. Take care not to
damage pump cable.
NOTICE To avoid dropping the pump down
the well or damaging cable or cable splices,
NEVER allow pump cable to support weight
of pump.

Pump Installation

being used, install two bleeder orifices about
orifices will automatically charge the tank with
NOTICE
pre-charged tank are replacing a standard
tank system, remove bleeder orifices before
installing pump in well.
2. To prevent losing pump down the well,
connect a safety rope strong enough to support
twisted polypropylene or pronila rope) to
eyelet on pump discharge. Tie off other end of
safety rope securely to well seal, well cap or
pitless adapter.
steel pipe for the entire drop pipe.
8
Tabla de contenido
loading

Tabla de contenido