System with two (2) control panels
CAN
POWER
SUPPLY
THRUSTER
11 Setting procedure
After all parts have been electrically connected to each other the set-
ting procedure must be carried out.
The setting procedure must be done before the push-pull cables
are connected to the engine,
And while the boat is moored.
• If already installed, unscrew the 4 screws securing the cover.
• Turn the cover of the actuator unit upside down.
• Remove the rubber plug.
• Look through the hole to see 2 push button switches and a row
of DIP switches.
• Adjustment of the actuator can be carried out by using these
switches.
Be careful, when using a screwdriver to operate the switches, to
prevent short circuit or damage to the electronic circuitry.
• Switch on the power to both the CAN bus and the actuator.
• Set DIP switch S4 in position ON.
S4 in position ON
S4 in position OFF
vetus® Installation Manual V-docker
CONTROL
PANEL
HUB
HUB
ACTUATOR
W
arning
W
arning
SETUP
RUN (Normal operation)
CONTROL
I/O BOX
I/O BOX
PANEL
HUB
Preliminary
ENGLISH
HUB
TERMINATOR
THRUSTER
1
2
4
SETUP
3
29
020702.01