4
Installation
We recommend that all parts of this system are installed by a professional installer.
5
Required system components
Component Description
Control Panel
Control box bow thruster c/w thruster
connection cable
CAN-Connection cable
CAN-Adaptor cable
All systems:
CAN-bus supply
CAN-Terminator
1) This is the minimum number of CAN-Connection cables required,
the correct number depends, a.o. , on the location of the hubs, see
'13 Wiring diagrams' .
2) The required number of CAN-Adaptor cables depends, a.o., on the
location of the hubs, see '13 wiring diagrams' .
6
Control panel and I/O box
Fit the control panel next to the steering position.
There must be at least 90 mm (3
The I/O box contains an warning buzzer and must be fitted therefore
close to the steering position as well.
6.1
Setting DIP switches in control panel(s)
• If already installed, unscrew the 4 nuts securing the panel.
• Turn the panel upside down.
• Remove the rubber plug.
• Look through the hole to see a row of DIP switches.
• The DIP switches must be configured as shown in the drawings.
24
020702.01
2 x Tube thruster
Helm positions
1
1
I/O box
1
2
Actuator
1
Hub
3
5
1)
x
2)
1
/
") space behind the panel.
2
Thrusters
2 x Retractable thruster
Helm positions
2
1
2
1
2
1
2
–
1
1
4
3
7
1)
5
1)
x
2)
x
2)
Preliminary
1 Tube thruster &
1 Retractable thruster
Helm positions
2
1
2
1
2
1
–
1
1
1
4
3
7
1)
5
1)
x
2)
x
2)
1
1
vetus® Installation Manual V-docker
2
2
2
1
1
4
7
1)
x
2)