Preparatory Work - G-U BKS B-1893 Serie Manual De Instalación

Cerradura con pestillo motorizada para sistemas de marcos tubulares
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation instructions
B-1893x | B-1993x
Motor-driven shoot-bolt lock for narrow stile systems
NOTE
44
3.
Installation
3.1

Preparatory work

Before starting the installation, check that all required products are complete and functional.
Correctly mount/deburr or check profile cutouts, hardware drill holes and cable bushings in
accordance with Appendix A3 or the relevant enclosed installation instructions.
Thoroughly remove swarf.
Attention electronics: make sure the lock recess is free of swarf and clean!
Retract the connection cable on the secured side of the door. Take care not to kink or bend the cable
in the process. Provide for a sufficiently large cable loop (~ 50 mm)!
Protect the connection cable against abrasion.
(Recommendation: use protective hose B 5490 0308)
Provide a cable disconnection point in the area of the cable link to make it easier to remove the door.
Max. cable length from the lock to the control unit/junction box is 10 m (length of pre-assembled
cable). In addition, larger cable cross-sections may be required to prevent voltage drops (see Fig. 2).
Length of connection cable B 5490 0300 (in m)
10
2
A (mm
)
Extension (in m)
0.34
12
Fig. 2: Cable lengths
EN
8
6
4
14
16
18
Distributor /
Branch
2
LA
20
LB
Control unit
10.2017 | 20734ES | Designed in Germany
Tabla de contenido
loading

Este manual también es adecuado para:

Bks b-1993 serie

Tabla de contenido