Installation
12. Connect the jet pump (92) to the main housing (1) on the
suction and pressure sides using the half screw (98, 99,
100), the rubber bracket (79) and the corresponding clamps
(75).
13. Connect the pump motor in accordance with the wiring
diagram.
Pay attention to the correct direction of rotation for
three-phase motors! Only carry out the direction of
rotation check when the pump is completely filled with
water!
14. Switching on and off from the pool using pneumatic buttons:
Pump ON/OFF (38/1) - right hand button
Light ON/OFF (38/2) - left hand button
15. With the air regulator (21/1) air can be added to the nozzle
from the pool:
OPEN - Left rotation
CLOSE - Right rotation
Fig. 15
30 EN
03|2020