Maintenance; Replacing The Led Floodlight - Speck pumpen BADUJET Vogue Instrucciones Para El Manejo

Dispositivo contra corriente para montaje emportado
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 296
8

Maintenance

NOTICE
Before maintenance work, close all shut-off valves and drain
all pipes.
When?
Regularly
If there is a chance
of frost
After completing all maintenance work, perform all necessary
measures for start-up. See point 6.1 on page 42.
Due to the various water components the parts made of stainless
steel have to be cleaned periodically to avoid possible corrosive
damage.
8.1

Replacing the LED floodlight

Fig. 29
03|2020
What?
Remove foreign matter from the
suction opening.
Turn the motor shaft (after long idle
periods).
Tighten the screws.
Drain pump and pipes sensitive to
frost in good time.
Maintenance
EN 49
Tabla de contenido
loading

Este manual también es adecuado para:

Badujet vogue deluxe

Tabla de contenido