5) INSTALLATION
5.1) Recebimento
At receiving an
Origo Feed
damages that could have happened during transport. Any complaints related to transport damage should
be directed to the transport company.
Remove carefully any material that could obstruct the refrigeration air system.
N.B.: In case an Origo Feed 304 is not installed immediately, keep it in its
original packaging or store it in a dry and well ventilated place.

5.2) Working area

Several facts should be taken into consideration when determining the working place of a welding machine,
in order to have a safe and efficient operation. An adequate ventilation is needed for the refrigeration of the
equipment and for the operator's safety.
The installation of any filter dispositive in the environment restricts the air volume availabe for the machine
refrigeration which can cause overheating to the internal equipment. All guarantee undertakings from the
supplier cease to apply if the customer/user installs any filter dispositive not authorized by the supplier.
N.B. DO NOT USE THE MAIN SOURCE NEUTRAL FOR EARTH
CONNECTION.
All the eletric connections should be fitted completely to avoid risk of
sparklings, over heating or voltage slopes in the circuits.
5.3) Installation of the feeder
1) Connect the wire feeder to the power source associated through the cable of comand.
2) Fix the welding cable connected to the terminal + power source in the block of connections in the wire
feeder.
3) Fix the hose of the gas pressure regulator in the inlet niple of the rear solenoid valvule of the wire feeder.
4) Install the welding gun (see especific manual).
5) Install the wire.
6) Install the feed rollers according to the type and wire diameter to be used.