Installation Of Indoor Unit; Installation Procedure - Toshiba RAV-SM562BT-E Manual De Instalación

Ocultar thumbs Ver también para RAV-SM562BT-E:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 116
3

INSTALLATION OF INDOOR UNIT

Install the air conditioner certainly at a place to sufficiently withstand the weight.
If the strength is insufficient, the unit may fall down resulting in human injury.
Perform a specified installation work to guard against an earthquake.
An incomplete installation can cause accidents by the units falling and dropping.

Installation procedure

1. Lay drain pipes, refrigerant pipes, and connecting cables behind wall
2. Install the mounting frames of supply/return air panels
3. Position the refrigerant and drain pipes
4. Install the indoor unit
5. Connect cables and pipes
6. Install supply/return air panels
7. Mount thermal insulation
8. Mount check port
or ceiling concurrently with supply/drain water work and piping work.
• Preparation for installation
WARNING
• Setting/fixing of indoor unit
5
Tabla de contenido

Solución de problemas

loading

Tabla de contenido