CAUTION
Repeat this procedure 2-3 times.
After final tank emptying disconnect the sanitation chamber and connect tubes with connector provided in
the sanitation set. Install new A2 and ion exchange modules. After service and sanitation first full volume of
the tank should be wasted to clean new ion exchange module, tank and tubes.
MODUŁ A
MODUŁ H6/H7
OUT
OUT
IN
IN
OUT
IN
CAUTION
We advise to empty the tank after not operating for more than 14 days.
69