We advise the user to contact our authorized service for professional support
7.6 Sanitation
Sanitation must be performed when changing ion exchange resins and least every 12 months. When saniti-
zing follow the instructions for safe use provided in the Sanitation Agent Specification Card.
Sanitation set
• Sanitation set
• Sanitation chamber
• Sanitation agent: Chloramin T sodium salt
• Connector set and backup tube
Procedure
• Fill sanitation chamber with sanitation agent - 1 pack.
• Sanitize with empty tank. Empty the tank first.
• Close tank valve.
• Disconnect ion exchange module (H6 or H7)
• Disconnect module A2.
• Connect sanitation chamber (according to schema):
- Tube "IN" from module A2 to sanitation chamber in place "IN"
- Tubes "IN" and "OUT" from H6 module with T-connector in tube "OUT" to sanitation chamber.
• Open feed water valve.
• Open tank valve.
• Leave for 1-2 hours.
• Close feed water valve.
• Dismount microfiltration capsule.
• After given period empty the tank through H2O tap.
• Open feed water valve.
• Fill the tank to 100%.
• Empty the tank.
68
CAUTION
before changing the RO module.