en
24 | COLIBRI BL512 26" ITAS | Product description
Pos.
Name
15
Sliding roller
16
Locking plate:
17
Movable lanes
18
Locking jaws
19
Inflation gauge
20
Deflation button
21
Inflation pipe
22
Bead lifting lever
4.
Initial commissioning
4.1
Unpacking
1. Remove the iron tape and the fixing clamps from the
pallet and the packaging cardboard.
i
After unpacking check the integrity of
COLIBRI BL512 26" ITAS and check that no compo-
nents are visibly damaged. In case of doubt do not
proceed to start-up and contact a qualified technici-
an and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2
Assembly
4.2.1
Cover removal
1. Unscrew the 4 screws of the side cover and remove
the cover itself.
4.2.2
Lifting of the tilting column
1. Get a 1 Mt lifting sling, DR 50 model (safety factor
6:1); wrap the sling around the cantilever arm (1),
|
105 890
2010-11-08
Function
To be inserted in the mounting tool rack, to avoid any kind of friction between the rim
and the mounting tool during tire mounting and demounting phases. For the alloy rims a
special "tab" is arranged.
Locking and rotation of the rim.
Positioning of the locking jaws.
Internal or external locking of the rim.
Tire inflation check.
The manometer is compliant to CEE 87/217 directive.
Tire defl ation.
Tire inflation.
Lifting of the tire edge in demounting and mounting phases.
2. Lean the column on the casing.
4.2.3
1. Fix the column to the casing with the screws contai-
open the bead breaking arm and lift the column with
a hoist (2).
2
1
Column fixing
ned in the provided accessories box.
!
Sicam srl società unipersonale