Combination With Combi-Steam Oven; Check The Installation - Gaggenau BO 450 610 Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Four wire connection
BO 480/481-610
1
Connect red wire from oven to red electrical
supply wire (hot wire).
2
Connect black wire from oven to black electrical
supply wire (hot wire).
3
Connect white wire from oven to white electrical
supply wire (hot wire).
4
Connect yellow/green ground oven wire to
electrical supply ground wire.
Attach flexible conduit to the junction box.
To facilitate serviceability, the flex conduit must not be
shortened and should be routed to allow for temporary
removal of the oven.

Combination with combi-steam oven

Fit the combi-steam oven first. Pay attention to the
combi-steam oven's installation instructions.
For an installation depth of 550 mm (approx. 1.8 ft),
position the water hoses and the connecting cable in
the area of the housing cut-out.
Combination with warming drawer,
width 24" (60 cm)
Fit the warming drawer first. Pay attention to the
warming drawer's installation instructions.
Slide the oven onto the warming drawer and into the
built-in cabinet. When sliding it in, do not damage the
warming drawer's panel.
Combination with warming drawer,
width 30" (76 cm)
Installation BO/BS (width 30" (76 cm)) over warming
drawer WS only with dimensionally stable partition
floor.

Check the Installation

9
WARNING
Before you plug in an electrical cord or turn on
power supply, make sure all controls are in the
OFF position.
Switch on the circuit breaker.
Verify that elements function properly.
Removal
1
Disconnect the appliance from the power supply.
2
Undo the fastening screws.
3
Raise the appliance slightly and pull it out
completely.
9
Tabla de contenido
loading

Este manual también es adecuado para:

Bo 451 610Bo 481 610Bo 480 610

Tabla de contenido