Once the machine is received, it should be transported to a place close to where it is to be in-
stalled:
Before transporting
Check that nobody is present within
the operating radius for lifting and
movement of the load and, in sit-
uations of particular difficulty, use
staff to monitor the movements to
1
be carried out.
Monitor the journey
Avoid journeys over rough or un-
even surfaces, paying attention to
the dimensions and possible parts
which jut out.
3
Once the packaged machine is in the vicinity of the place where it is to be installed, it is neces-
sary to proceed as follows:
Cut the nylon strips
It is prohibited to make additional
cuts in the packaging.
1
Putting the machine in
place
Put the machine in the planned lo-
cation.
3
Recycling
On the one hand, it can be subdivid-
ed according to the type of materials
of which it is made up and they can
be treated according to the provi-
sions of the rules in force in the coun-
try where the machine is located.
3.Installation
3.Installation
3.Installation
3.2 Transport of the machine
Lifting and transport
Lift the packaged machine and
transport it with care; the move-
ment of the machine must be car-
ried out in a vertical position by at
2
least two persons.
The damage that the machine might suffer during trans-
port and movement is not covered by the GUARANTEE.
Repairs or replacement of parts that may have been
damaged must be carried out at the cost of the customer.
Lift the cardboard cover
Try not to damage the packaging as
it may be useful to move the ma-
chine in the future or for transport-
ing the machine.
2
3.4 Treatment of the packaging
Conserve for future use
On the other hand, it is possible to
conserve the packaging as it might
be useful for future movements or
transport of the machine.
O
Transport / Unpacking / Packaging
3.3 Unpacking
9