BOX #2 – Router table assembly, contains:
See Figures 7-7 and 7-8.
1
Router table assembly – R1
1
Electrical box – R2
1
Drawer cabinet – R3
1
Controller cable – R4
1
Tool touch-off puck – R6
1
Step motor – R7
1
Controller – R8
1
Top guard – R9
2
Spindle wrenches – R10
1
ER20 Collet – R11
4
Hold-downs – R12
1
Dust shoe – R13
1
Instructions and Parts Manual (not shown)
1
Warranty card (not shown)
3
Hardware packages:
PM2X2R-HP1
20 Soc hd cap screws M5x12 – HP020
4
Plastic caps – HP021
PM2X2R-HP2
4
Soc hd cap screws M6x35 – HP022
PM2X2R-HP3
4
Rubber foot pads – HP023
4
Hex cap screws M10x45 – HP024
4
Flat washers M10 – HP025
7.5 Unpacking and cleanup
1.
Remove all contents from shipping carton. Do
not discard carton or packing material until
machine
is
assembled
satisfactorily.
2.
Inspect contents for shipping damage. Report
damage, if any, to your shipping agent and
distributor.
3.
Compare contents of shipping carton with the
contents list in this manual. Report shortages, if
any, to your distributor.
7.6 Tools required for assembly
The following tools are not provided:
Forklift or hoist
#2 cross-point screwdriver
10mm,13mm,17mm sockets with ratchet wrench
and extension
24mm open end wrench
2mm and 3mm hex keys
Rubber mallet
Bubble level
and
running
Figure 7-7: PM-2x4SP table contents (not to scale)
13
Figure 7-8: additional accessories