6.8
After-flushing recommendations
After having performed a system flushing we are recommending the following steps:
Replace all O-rings of the system
Replace the receiver drier or accumulator
Drain and replace the compressor oil
Reassemble the complete A/C system
Pressurize the system with nitrogen and check for leakages
Bring the system to deep vacuum to remove all moisture
Inject UV additive in prevention for detecting leakage
Recharge lubricant and refrigerant within manufacturer specifications
Verify proper functioning of the system. (Noise, pressure, performances, leak check...)
ACKF01_GB_00
TEXA S.p.A.
101/122