It will pop up a confirmation message if calibration has been successful. If it is
not, the failure message will be shown. Try calibrate this probe again, if fail
calibration persists, your probe may be deteriorated or pattern liquid are wrong
pH adjustment will start after 5 minutes, since the equipment has
been switched on.
At the bottom of the menu, there is an button for a manual ph pump dosing.
The pump will be running for 30 seconds. This feature will prime the ph circuit
to be ready when it is needed.
A proportional control automatically adjusts the pH without the need for
controller adjustments. The pump will start up every minute and with a variable
operation time of between 0 and 60 seconds.
ATTENTION: It is required to do a pH probe calibration during the
equipment installation. New calibration should be done on changing
or cleaning the probe.
4.1.2.6 Conductivity menu
At the Main Screen there is an option of calibrate Kit Conductivity. Press at the
bottom left of the screen to access. It is recommended obtain a sample of the
pools water and analyze before use calibrating function.
In this menu, there is a CAL button which allows to calibrate the salt probe to
the correct value. Press + to increase the value or – to decrease. When the
value matches the previous analyzed sample, press ok.
97 / 120
Manual EVOLINK v.5