Cable Connections - Festo 8082795 Instrucciones De Servicio

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Storing/Conveyor station

13.3 Cable connections

62
1
PLC board – motor controller board
When using the 19" module:
Using a SysLink cable, connect socket A of
the right-hand module to the SysLink
socket on the motor controller board.
2
PLC board – control console
When using the 19" module:
Using a SysLink cable, connect socket B of
the right-hand module to the SysLink
socket on the control console.
3
PLC board – station
When using the 19" module:
Connect socket A of the left-hand module
to the SysLink socket on the C interface
using a SysLink cable or the SysLink
socket at the station's digital
I/O terminal.
4
Motor controller – power supply unit
The motor controller is supplied with
power via a separate 24V ≤ 100 W power
supply.
PLC board – power supply unit
Insert the 4 mm safety plug into the
socket on the power supply unit.
PC – PLC
Connect your PC to the PLC via a
programming cable.
© Festo Didactic 8083287
Tabla de contenido
loading

Tabla de contenido