Fixed Station; Operation Panel Installation - Kenwood TM-D710GA Manual De Instrucciones

Doble banda de 144/440 mhz en fm/
Ocultar thumbs Ver también para TM-D710GA:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Note: If you use the transceiver for a long period when the vehicle battery is not fully charged
or when the engine is OFF, the battery may become discharged and will not have suffi cient
reserves to start the vehicle. Avoid using the transceiver under these conditions.
1 Route the DC power cable supplied with the transceiver directly to the
vehicle's battery terminals using the shortest path from the transceiver.
When using a noise fi lter, it should be installed with an insulator to prevent it
from touching metal on the vehicle.
We do not recommend using a cigarette lighter socket as some cigarette lighter
sockets introduce an unacceptable voltage drop.
If the power cable must be routed through a hole in the vehicle chassis or body,
for example in the fi rewall at the front of the passenger compartment, use a
rubber grommet to protect the cable from abrasion. Dismantle the fuse holder to
pass the cable through the fi rewall.
The entire length of the cable must be dressed so it is isolated from heat,
moisture, and the engine secondary (high voltage) ignition system/ cables.
2 After the cable is in place, wind heat-resistant tape around the fuse holder
to protect it from moisture. Tie down the full run of cable.
3 To prevent the risk of short circuits, disconnect other wiring from the
negative (–) battery terminal before connecting the transceiver.

FIXED STATION

■ Operation Panel Installation

1 Attach the panel holder to the base stand using the 2 supplied SEMS
screws.
2 Attach the operation panel to the panel holder so that it locks in place.
4
Panel holder
Operation panel
SEMS screw (M4 x 10 mm)
Base stand
Tabla de contenido
loading

Este manual también es adecuado para:

Tm-d710ge

Tabla de contenido