EN
Load Chain
CAUTION
● Only use original chains supplied by manufacturer.
● Welded seam of the chain links must face inward on the chain wheel (Refer to Fig 2. MHP4157).
● The geared limit switch must be mechanically disabled in order to install in the chain,
see section on Limit Switch.
(Fig 2. MHP4157)
Before start-up and during operation, the load chain must be oiled along its full length. Oil
must constantly be present on the internal, contacting and rubbing surfaces of the chain links.
Lubrication is carried out by submersion or with an oil can, using a creeping gear oil. The end
of the chain (1) should be attached to a flexible piece of wire or chain pulling loop (2) and fed
through the chain wheel (3) of the electric chain hoist. Run hoist slowly in the lifting direction,
the chain will be pulled in correctly according to Fig 2. MHP4157. The lifting height must be
adjusted such that the hook fittings lie on the ground in the lowest hook position.
Single fall operation
The load hook (1) is connected to the chain with a single fall hook clamp (2). For the power
transmission, the mounting of the bolt (3) is important (see Fig 3. MHP4158).
(Fig 3. MHP4158)
Form 47584686001 Edition 5
11