Putting Into Operation; Electric Shock - Abicor Binzel iROB P400 Instructivo De Servicio

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

iROB

6 Putting into operation

Risk of injury due to unexpected start-up
For the entire duration of maintenance, servicing, mounting, dismounting and repair work, the following
instructions must be adhered to:
• Switch off the power source.
• Pull the mains plug.
Risk of injury
Increased noise pollution.
• Wear your personal protective equipment: ear protection.

Electric shock

Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
Risk of injury
Limbs can be crushed and cut.
• Use an appropriate lifting tool with load securing devices for transport and installation.
NOTICE
• Please take note of the following instructions:
• The system may only be installed and put into operation by authorized personnel (in Germany see
• Components must only be used in environments with sufficient ventilation.
• The interconnection (serial or parallel connection) of several power sources may result in material
DANGER
CAUTION
WARNING
WARNING
 3 Product description on page EN-7
TRBS 1203).
damage.
6 Putting into operation
EN - 13
Tabla de contenido
loading

Este manual también es adecuado para:

Irob p400 mvIrob p500

Tabla de contenido