Putting Into Operation - Abicor Binzel PP Plus 36D Manual Del Usuario

Ocultar thumbs Ver también para PP Plus 36D:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4 Putting into operation

4 Putting into operation
DANGER
Risk of injury due to unexpected start-up.
The following instructions must be adhered to for the entire duration of maintenance,
servicing, mounting, dismounting and repair work:
• Switch off the power source.
• Close the gas supply.
• Close off the coolant supply.
• Close off the compressed air supply.
• Disconnect all electrical connections.
• Switch off the entire welding system.
DANGER
Risk of injury and machine damage when handled by unauthorised persons
Improper repair work and modifications to the product may lead to serious injuries and
damage to the device. The product warranty will be rendered invalid if the unit is handled
by unauthorised persons.
• Operating, maintenance, cleaning and repair work may only be carried out by qualified
personnel (in Germany see TRBS 1203).
NOTICE
• Please take note of the following instructions:
 2 Safety on page EN-3
EN - 6
PP Plus 36D/240D/401D
BAL.0140 • 2018-10-15
Tabla de contenido
loading

Este manual también es adecuado para:

Pp plus 240dPp plus 401d

Tabla de contenido