Atlas Copco ETVST61-28-10 Instrucciones Del Producto página 6

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
Installation
Installation
Installation requirements
Installation
Connecting tool
The tool should, via its correct Power Focus drive unit, be connected to the mains, 230V/50Hz alterna-
tively 115V/ 60Hz, single phase. See instructions for your Power Focus drive unit.
Tool display
The tool display is turned on from the controller.
On Power Focus 4000:
Push the Prog button
Use the navigation buttons to follow the path > Tool > Configuration > Accessory bus > ST bus >
Mode
Socket release function
It is recommended to use the socket release function on all the ETP ST101 tools. When the function is en-
abled, the socket rotates backwards 3
reaction bar and to make it easier to remove the tool.
The socket release function is turned on from the controller.
On Power Focus 4000:
Push the Prog button
Use the navigation buttons to follow the path > Pset > Programming+ > Options > Socket release >
Mode On
Grounding
If the tool is mounted in a handheld or hand guided fixture, the fixture should be connected to the drive us-
ing a separate 2.5mm
Installation instructions
Fitting of the tool cable
Security check that the cable type is correct
Align the cable connector using the two asymmetrically positioned heads on the connector to fit in the
slots in the tool handle.
Tighten the lock nut.
Security check that the connection is correct by pulling, pushing and turning the cable connector
(there should be no movement).
The tool has a built in electronic memory chip that will transmit the torque transducer calibration value
and angle pulses to the POWER FOCUS/drive unit. Any changes made of these values in the
POWER FOCUS while the tool is connected will be stored in the tool memory.
6
o
after a completed tightening. The aim is to reduce tension on the
2
grounding cable.
© Atlas Copco Industrial Technique AB - 9836 8491 00
EN
ETVST61-28-10
loading

Este manual también es adecuado para:

8433202176