Alemite 7795-A5 Manual De Servicio E Instalación página 14

Bomba de engrase alta presión
Idiomas disponibles

Idiomas disponibles

Operation
Bench test and prime
NOTE
Perform the following procedures at a
pressure not to exceed 40 psi (2.8 bar).
Make sure air pressure at regulator reads
zero.
1 Connect a product hose to material
outlet.
2 Place hose into an appropriate collection
container.
3 Install air connector (3) to inlet of air
motor.
4 Connect an air line to air coupler (4).
5 Connect air coupler to connector.
6 Slowly supply air pressure to pump
motor.
7 Pump should cycle. If pump does not
cycle, refer to Troubleshooting, page 15
for details.
Priming
With air pressure at zero:
1 Place pump in product to be dispensed.
2 Slowly supply air pressure to pump
motor.
3 Allow pump to cycle slowly until system
and product is free of air. If pump does
not prime, refer to Troubeshooting,
page 15 for details.
4 Check motor for air leakage. If motor
leaks, refer to air motor manual 397871
for details.
WARNING

Do not operate with leakage in system.
Disconnect air to motor.
Failure to comply may results in
serious injury.
Stall test
With air pressure at zero:
1 Attach a control valve to outlet hose of
pump.
2 Set air pressure to 100 psi (6.9 bar).
3 Operate control valve into a container.
4 Allow pump to cycle until system and
product is once again free of air.
5 Shut off control valve.
6 Pump should not cycle. If pump cycles
slowly (once or twice a minute) or
continuously, refer to Troubleshooting,
page 15 for details.
14
loading

Este manual también es adecuado para:

7795-b5