Dometic SANITATION MASTERFLUSH MF7100 Instrucciones De Montaje página 11

Inodoro con sistema de trituración
Ocultar thumbs Ver también para SANITATION MASTERFLUSH MF7100:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
Macerator Toilet
possible. See "Above water line system"
on page 7.
3. Install a vented loop (not supplied).
– For recommended locations of discharge
vented loops connected to system
components that are below the water
line or may be less than 8.0 in. (203 mm)
above the highest possible water line at
full heel, see Figure 7 and Figure 8.
– Vented loops must be positioned a
minimum of 8.0 in. (203 mm) above
highest possible water line at full heel.
6.5 Toilet and flush switch
1. Carefully unpack the toilet, water supply
hose, discharge fitting, and hardware). See
Figure 1.
2. Place the toilet in the desired location on
the floor. If necessary, rotate the toilet so that
macerator pump housing does not interfere
with walls, or so that it accommodates the
intended plumbing layout. See Figure 2.
3. Confirm adequate clearance is available for
the plumbing connections, and also the seat
and lid in raised position.
4. Mark the floor where the toilet will be
installed.
5. (Optional) If the macerator pump and base
must be positioned at an angle so that toilet
bowl does not face the wrong direction,
rotate the upper bowl to the proper
position.
9
Loosening the compression band
a. Loosen the compression band just
enough to slip down past the lower
plastic clamp.
EN
10
Removing the plastic clamps
b. Remove the upper and lower plastic
clamps.
11
Positioning the gasket
c. Lift the bowl. Make sure the notch in
the black rubber gasket sits around
the shallow pin on the toilet base and
remains centered between the bowl
and base.
d. Rotate the bowl to the desired position,
then set it down on gasket.
e. Re-position the plastic clamps and
compression band between the upper
bowl and base.
f.
Join the clamps together at the front of
the toilet bowl. There will be a space
between the clamps behind the bowl.
g. With the compression band screw
positioned on a clamp (not in
gap between clamps) tighten the
compression band to 65 in. lbs
(7.3 N-m).
6. Connect the water supply hose between
the check valve or adapter and water valve
(freshwater flush model) or the water pump
(sea water flush model) on the base. See
Figure 2.
a. Cut the supply hose to a length that will
not kink when connected.
b. Remove the plastic cover from the
pump. See Figure 2.
Installation
11
loading