INSTALLATION
4
ELECTRICAL CONNECTIONS
Complete the installation in line with low voltage regulations and applicable rules.
Use cables with sufficient section, always earthed (see "Elements of the complete installation (swing
gate)" on page 39.
Check the manufacturer's instructions for all the elements installed.
Power supply and operator connections
When
using
operator, connect it to
cable connectors G1, G2
and G3 (operator A1).
A1, A2
operators
C1, C2
capacitors
DL4
open indicator
DL5
close indicator
PUL1
close mini-pushbutton
PUL2
open mini-pushbutton
T
earth connection
When pressing PUL1 (close), DL5 lights up and the G2 and G3 and G5 and G6 cable connectors are activated.
When pressing PUL2 (open), DL4 lights up and the G1 and G3 and G4 and G6 cable connectors are activated.
Fig. 3
Power supply and operator connections
44
Installation Manual
FCA2 COM FCC2
SCA
P7 P8
P1 P2 P3
P4 P5 P6
P15 P14 P16
P11 P12
P22 P23
ST1
STOP
LOCK
FT1
ST2
FT2
FCA1
FCC1
a
single
A1 operator connections
G1
open
G2
close
G3
common (COM), grey cable
G4
G5
G6
G1
G2
G7 G8
G9 G10
Courtesy
24Vac
Lamp.
MOTOR2 (G2-G1-COM)
MOTOR1 (G2-G1-COM)
Light
G4 G5 G6
G1 G2 G3
G3
N
L
POWER
VIVO-M201: 230Vac/50Hz
VIVO-M201M: 125Vac/60Hz
A2 operator connections
G4
open
G5
close
G6
common (COM), grey cable
P169V