Start first installation
The live analysis has no claim to complete accuracy.
However, it is recommended that the installation and
configuration be checked if different information is
provided:
–
In the case of an incorrect current direction:
Check the installation of the current converters
and the connection of the current converter
lines to the device to ensure that individual cur-
rent transformers have not been connected the
wrong way around.
–
If the phase is different: Check the installation
of the current converters, whether the current
converters are on the correct phase and, if nec-
essary, adjust the configuration of the phase in
the web application for the current converter.
9. Home setup: Configuring power sources
The connected current transformer is specified for
each phase of the house connection and for other
power sources (e.g. photovoltaic system) available at
the place of use.
Home connection
Only the current converters created in step 8 are
displayed.
1. Assign a current converter to a phase.
2. If necessary, create additional current converters
in step 8.
Photovoltaic system
If there is a photovoltaic system at the place of use,
information about the connection type and feed-in
compensation is required for energy management.
1. Activate function.
2. Select the connection type for the photovoltaic
system:
24
Option
Explanation
Load side or
The photovoltaic system is con-
excess feed
nected to the mains power supply
after the house connection.
Excess energy from the photovol-
taic system flows via the house
connection into the grid (the cur-
rent measured by the energy
manager at the house connection
can be positive in this case).
Mains side/
The photovoltaic system is con-
full feed
nected to the mains power supply
in front of the house connection.
The energy from the photovoltaic
system is fed directly into the
grid.
Example
Shows the two configuration
types in an example.
Phases and current converter
If there is a photovoltaic system, the phases can be
selected and the current converters assigned here.
1. Select the number of phases.
2. Assign current converter.
3. If necessary, create additional current converters
in step 8.
Information
Additional current converters are available as spare
parts from your Porsche partner.
Information
In the case of load-side installation or excess feed-in,
the assignment of current converters is not manda-
tory for the use of the self-consumption optimization
function. In this case, only the number of phases
must be selected. However, this does not guarantee
complete energy statistics.
10. Home setup: Specifying power consum-
ers
Existing power consumers (e.g. garage, sauna) and
EEBus devices (e.g. chargerPorsche Mobile Charger
Connect, Porsche Mobile Charger Plus) are specified
here and the current converters are assigned to the
phases used.
EEBus is a communication protocol that is integrated
with the charger Porsche Mobile Charger Connect,
for example. If both the energy manager and an EE-
Bus device are in the same network, the protocol
allows pairing of both devices.
Always observe the following requirements when
adding a consumer:
–
The power consumer or the EEBus device must
have a current converter at each phase.
–
The number of phases of the supply cable on the
EEBus device is known and will be configured
accordingly.
The power supply for each of the power consumers
listed here can be displayed in the Overview and
History.