Installing The Shoulder Strap - 100' Flexible Pipeline Inspection Reel - Milwaukee 2970-20 Manual Del Operador

Tiralíneas de inspección de tubería flexible
Ocultar thumbs Ver también para 2970-20:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4
Pipeline Inspection Reel
4.5 Installing the Shoulder Strap – 100' Flexible
Pipeline Inspection Reel
The 100' flexible pipe inspection reel is equipped with a
shoulder strap that allows the reel to be carried over the
shoulder like a shoulder bag.
When using a shoulder strap to transport the reel, ensure that the clips on
both sides have been fixed on the lifting lugs.
1. Find two stainless steel lifting lugs on the back of the
reel.
2. Hold the lock catch at both ends of the shoulder strap,
and press the lock catch firmly until the lock catch on the
stainless steel lifting lugs.
3. After installing the lock catch on both sides, check the
lock catch and pull the shoulder belt to ensure that the
lock catch is firmly clamped on the lifting lug.
1. Hold the lock catch on the lifting lugs on both sides, and
press the lock catch down firmly to separate it from the
lifting lugs.
2. Now the lock catch has been removed from the reel.
Installing the shoulder strap
Removing the shoulder strap
64
Shoulder Strap
Tabla de contenido
loading

Este manual también es adecuado para:

2971-202972-202973-202974-202975-202976-20 ... Mostrar todo

Tabla de contenido